TMK owns 20% of the Talisman Deep Project, which contains the Napoleon structure which is located in WA-8-L below Talisman in the Barrow-Dampier Sub-basin.
Simple large structure – 3D reprocessing in progress – target size similar to Dorado and neighbouring Wanaea.
80-90m water depth.
Proven productive reservoir (North Rankin Formation) at approx. 4,200m.
Proven reservoir/seal (Murat Siltstone) pair. Charge – structure located in the liquids rich part of the basin dominated by charge from Lwr-Mid Jurassic. Geochemical modelling in progress.
Full technical evaluation with independent prospective resource estimate underway – target late July 2021.